UOSA IFB 27-01 GAC Treatment Optimization
- Entidade adjudicante
- Upper Occoquan Service Authority
- País
- Estados Unidos
- Local
- 14631 Compton Rd., Centreville, VA 20121
- Prazo
- 6 de outubro de 2026
- Publicado
- 15 de setembro de 2026
- Procedimento
- Invitation for Bids (IFB)
- Setor
- Construção
- Fonte
- eVA — Virginia Business Opportunities
- Publicação
- 15 de setembro de 2026 às 14:58 UTC
- Prazo
- 6 de outubro de 2026 às 14:00 UTC
- Referência
- IV127897
Detetado pelo Scoutee a 07/09/2026
Descrição
Phase 1 of the GAC Treatment Optimization Project includes, but is not limited to, retrofitting one L/2 Building carbon contactor, consisting of two cells, to serve as the per- and polyfluoroalkyl substances (PFAS) pilot study system; restoring upflow and downflow operating capability through modifications to the existing underdrain nozzle system; and implementing a proof-of-concept evaluation for carbon transfer improvements. If authorized by the Owner, Phase 2 of the Project will include, but is not limited to, retrofitting the remaining seven carbon contactors (i.e., fourteen cells) with the selected improvements based on the results of Phase 1. A complete description of the Work can be found in the Contract Documents.
Outros concursos desta entidade adjudicante
- UOSA IFB 27-02 P2NR+ Construction
- Entidade adjudicante
- Upper Occoquan Service Authority
- Local
- 14631 Compton Rd, Centreville, VA 20121
- Prazo
- Prazo: 22/10/2026 · Faltam 33 dias
Concursos semelhantes
- HVAC - Water Treatment
- Entidade adjudicante
- DEPT OF DEFENSE - DEPT OF THE ARMY - W6QK ACC-APG DIR
- Local
- Aberdeen Proving Ground, MD, USA
- Prazo
- Prazo: 23/09/2026 · Faltam 4 dias
- SURFACE TREATMENT - SECONDARY
- Local
- Virginia
- Prazo
- Prazo: 28/10/2026 · Faltam 38 dias
- Cancer Care Treatment Chairs
- Entidade adjudicante
- DEPT OF DEFENSE - DEPT OF THE AIR FORCE - FA8601 AFLCMC PZIO
- Local
- Wright Patterson AFB, OH, USA
- Prazo
- Prazo: 23/09/2026 · Faltam 4 dias