Vai al contenuto
United States5 giorni rimasti

16--CYLINDER ASSEMBLY,A, IN REPAIR/MODIFICATION OF

Descrizione

CONTACT INFORMATION|4|N763.05|P5F|771-229-0468|[email protected]| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and receiving report combo type |N/A|TBD|N00383|TBD|TBD|See schedule |TBD|||TBD|||||| MONETARY LIMITATION REPAIR PURCHASE ORDERS|1|N/A| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months |60 days after discovery of defect||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: 35 days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred.

Valore stimato

Non specificato

Committente

DEPT OF DEFENSE - DEPT OF THE NAVY - NAVSUP WEAPON SYSTEMS SUPPORT

Luogo

United States

Calendario

  1. Pubblicazione6 ottobre 2026
  2. Termine offerte5 novembre 2026 alle ore 20:30 UTC
Quesiti entro
Non specificato
Sopralluogo
Non specificato
Avvio
Non specificato

Non trovato nelle fonti disponibili.

Criteri di aggiudicazione

Non trovato nelle fonti disponibili.

Dettagli

Procedura
Solicitation
Tipo di contratto
Non specificato
Durata
Non specificato
Renewals
Non specificato
Offer validity
Non specificato
Variants
Non specificato

Documenti da presentare

Non trovato nelle fonti disponibili.

Requisiti

  • Contractor must provide a throughput Constraint for each NSN(s)
  • Accurately report all transactions by the end of the fifth regular business day after receipt
  • Obtain final inspection and acceptance by the Government for all assets within the RTATs

Riferimento

Riferimento
2d8087be45ae4b84aebb6431006b146d
Fonte
SAM.gov

Il bando completo nel tuo spazio

Crea un account per consultare i dettagli disponibili e avviare un’analisi quando necessario.

Crea un account

Altre gare di questa stazione appaltante

  • REPAIR AND UPGRADE 1 UNIT 014601334 TO016523514
    Committente
    DEPT OF DEFENSE - DEPT OF THE NAVY - NAVSUP WEAPON SYSTEMS SUPPORT
    Luogo
    Phoenix, AZ, USA
    Data di scadenza
    Data di scadenza: · 20 giorni rimasti
  • N0038327QN144
    Committente
    DEPT OF DEFENSE - DEPT OF THE NAVY - NAVSUP WEAPON SYSTEMS SUPPORT
    Data di scadenza
    Data di scadenza: · 13 giorni rimasti
  • 16--TURRET UNIT, IN REPAIR/MODIFICATION OF
    Committente
    DEPT OF DEFENSE - DEPT OF THE NAVY - NAVSUP WEAPON SYSTEMS SUPPORT
    Data di scadenza
    Data di scadenza: · 43 giorni rimasti

Bandi simili

NAICS 336413 · PSC 1650